FACADE SCAFFOLDING ROM MODEL - DIMENSIONALLY COMPARABLE TO THE RUX SYSTEM

Façade scaffolding - ROM model PIONART type (dimensionally compatible with RUX scaffolding) consists mainly of steel components permanently protected against corrosion by hot-dip galvanizing.

 

FEATURES OF MAJOR COMPONENTS:

FRAME

Thanks to the use of a unique specialized tube press in the production process, ROM scaffolding frame stands are made from a single section of material. For the frame stands we use steel tubes of the S355JRH grade with significantly increased strength parameters (yield strength at 460 - 470 MPa). Thanks to the use of such a good material, it is possible to use pipes with a wall thickness of 2.7 mm, as allowed by the latest European standard for scaffolding: PN-EN 12810-1:2010. The frame in the described design is about 2 kg lighter and has better performance than the traditional one made of S235JRH steel.

STEEL DECK

Thanks to the use of roll forming technology and material with appropriate parameters, a special shape of the deck was obtained (the only such product on the market with a width of 290 mm) with an anti-slip layer, characterized by high rigidity and strength, with relatively low weight. The decks have handles for easy installation on the scaffolding.

COMMUNICATION DECK

Vertical communication on the scaffolding is possible through the use of aluminum-plywood communication decks with a manhole and ladder. We use waterproof, non-slip plywood with a mesh imprint on one side (certified to DIN 68705, E1 emission class certificate) for the production of decks. The use of a smooth aluminum profile protects the decks from belt damage during transport.

HANDRAILS

The handrails are made of pipe with a diameter of 38 mm and a wall thickness of 1.8mm in S235 grade. The production technology includes crimping of pipe ends and trimming to size using eccentric presses, followed by hot-dip galvanizing, which is the only method of corrosion protection that guarantees permanent protection (we do not produce handrails from galvanized pipes!).

Assembly of handrails
Assembly of decks
Assembly of the cross railing
Assembly of diagonal bracing
Assembly of L frame
Installation of the upper frame.